Steel & mineral processing
Pelletizing Productivity Enhancement

More consistent pellets.
A clearer operating target.

Dorsa’s pelletizing productivity system applies intelligent monitoring and image-processing expertise to an operating priority: better pellet quality with higher throughput and lower energy use. Define a pilot around one plant, its current feed and the production constraints that matter most.

DORSA · Dorsa product portfolio image●●●
Pellet-handling imagery from the supplier portfolio, illustrating the application area.
Product capabilities

A defined task on your production line.

Select the inspection or measurement scope around the product, operating conditions and the action the team needs to take.

01

Pelletizing focus

A dedicated solution for the pelletizing stage of the iron-and-steel value chain.

02

Production objective

Evaluate the effect on saleable production using a matched operating baseline.

03

Quality objective

Agree the pellet-quality indicator used to judge the improvement at your plant.

04

Energy objective

Assess specific energy consumption alongside throughput and product quality.

05

Plant integration

Define operator feedback and any control-system exchange during technical scoping.

06

Operating evidence

Use representative feed conditions, product mix and steady-state periods in acceptance testing.

Operating workflow

Inspection results within the plant workflow.

The pilot defines the capture conditions, reference checks and response to a finding.

01

Acquire

Capture representative images or measurements under the agreed line conditions.

02

Analyse

Apply the selected inspection or measurement function and present the result.

03

Review

Route exceptions to the responsible operator and agree any automation interface.

04

Improve

Compare against independent reference checks and use results in the operating workflow.

Supplier-stated figures & scope

Keep each figure tied to its application.

Figures below come from the supplied presentation. Confirm definitions, configuration and acceptance conditions for your site.

01

Reported production effect

2–5% production increase in the supplied presentation.

02

Reported quality & energy effect

20% pellet-quality improvement and 3–9% lower energy consumption; the metric definitions and baseline require project confirmation.

03

Economic example

US$4–10 million annual added value per plant is a supplier example, not a price or a Russian-site forecast.

Equipment & installations

From the supplied Dorsa portfolio.

Original installation and equipment imagery. Click an image to inspect the details.

Where it fits

The operating team and its first use case.

Choose a starting point that can be evaluated on representative plant data.

01

Pelletizing plants

Focus the pilot on the plant’s production bottleneck.

02

Process & quality teams

Review production, quality and energy together.

03

Modernisation programmes

Define the retrofit scope around the installed process and controls.

04

Operating management

Use validated site results to decide expansion.

References listed in the presentation

Reported installation experience.

MSC (2017), KSC (2019), PASCO (2020), Chadormalo (2021), Sangan and OPAL (2022), Gohar-Zamin (2023), Sanabad (2024).

Names and dates reproduce supplier-reported project references. HOOMAS can coordinate requests for the relevant project scope and supporting customer evidence.

Deployment for Russian industry

Fit the plant and its control environment.

Agree these items as part of the technical proposal and pilot.

01

Automation & data

Agree signals, network interfaces, Level 2 exchange where stated, event records and the operator response. Existing PLC/DCS compatibility is confirmed for the selected scope.

02

Russian operator workflow

Agree Russian terminology, defect labels, units, reports and training for the operating and maintenance teams.

03

Calibration & installation

Define the reference method, measurement uncertainty, optical access, illumination and protection against the actual heat, dust or vibration.

04

Delivery & lifecycle

Agree equipment supply, hosting/data location, spares, service responsibilities and the maintenance access needed to sustain performance.

Relevant market reference

Compare the actual application scope.

A functional reference helps structure the evaluation. It is not a head-to-head ranking or a statement of Russian availability.

CriterionDorsaMetso Optimus Pellet
Application focusThe functions and configuration described above, selected for the target production line.Advanced process control and an expert-system proposition for pellet induration. Compare the process boundary and the actual control scope.
Pilot comparisonValidate the chosen function on representative material and independently reviewed reference data.Compare the corresponding module, deployment method and acceptance criteria on the same use case.

Based on the supplied Dorsa presentation and the linked official vendor material reviewed 26 October 2026. Project configuration, integration and local support determine practical suitability.

Metso Optimus Pellet ↗
Your first deployment

Start with a focused pilot.

Use an agreed operating baseline and independent reference checks before expanding the installation.

01

Define the baseline

Select a line, representative product conditions and the exact result to improve.

02

Run a representative trial

Test normal operation, defects or measurement extremes against independently checked references.

03

Accept measured results

Review misses, nuisance events, repeatability and operator use, then agree the rollout scope.

Your contact point · HOOMAS

Bring the line conditions and the inspection task.

HOOMAS coordinates product demonstrations, technical assessment, pilot scope and the commercial proposal with the technology partner.

Email HOOMAS ↗
Dorsa product portfolio image