Traffic behaviour analysis
Study statistical and timing characteristics of captured industrial communications.
AVIR’s reported industrial-control project combines protocol investigation, equipment analysis and an initial intrusion-detection capability. The goal is to interpret relevant configuration commands, monitored parameters and diagnostic events, then send agreed findings into the security-management workflow.
Select the data, analytical function and engineering deliverable around the task that needs to be completed.
Study statistical and timing characteristics of captured industrial communications.
Develop an interpretation of relevant command and data exchanges for the agreed control-system environment.
Identify the configuration commands described in the source project.
Identify monitored parameters and values and analyse card-originated diagnostics and alarms.
The source reports an initial IDS capability with detection independent of the Honeywell application servers.
Send collected information to the agreed security-event-management system.
The engagement defines the evidence, validation steps and responsibilities for delivery.
Choose one bounded use case and document the inputs, target output and responsible reviewers.
Test the selected workflow with representative customer material and an agreed independent reference.
Review evidence, unresolved issues and reproducibility, then complete the agreed documentation and deliverable.
Agree the rollout or handover after acceptance.
The supplied material describes the following project boundaries. Confirm the selected environment and acceptance criteria.
Honeywell industrial-control equipment, including FIM cards and operator/engineering software analysis. This is project experience, not a vendor partnership claim.
More than 68,000 parameters identified in the source project. Coverage depends on the accessible zones and configuration.
The presentation calls the IDS an initial system. Agree the validation environment, protocol coverage, event quality and SIEM interface for a new deployment.
Source illustrations or interface examples for the selected application. Click to enlarge.
Choose a starting point that can be evaluated on representative plant data.
Build visibility for the selected control-system communications.
Understand configuration exchanges and monitored process parameters.
Evaluate event handover and operator investigation workflows.
Validate interpretation and detection before a plant rollout.
The petroleum presentation names Persian Gulf Star Oil Refinery in connection with industrial-control security. The evidence describes protocol-analysis work and an initial IDS, with new-site scope requiring separate validation.
Project references and technical figures are reported in the supplied documents. HOOMAS coordinates requests for scope details and supporting evidence.
Agree the local interfaces, language and operating conditions for the selected project.
Agree Russian terminology, source-data availability, processing/storage location, confidentiality and access boundaries.
Validate the required interfaces, versions, file formats and exchange with the customer’s current systems.
Use representative Russian project inputs, domain specialists and a defined reference method.
Agree equipment/software dependencies, support, training, source/artifact handover and the applicable project rights.
A functional reference helps structure the evaluation. It is not a head-to-head ranking or a statement of Russian availability.
| Criterion | AVIR | Positive Technologies PT ISIM |
|---|---|---|
| Application focus | The AVIR project scope described above, configured around the selected customer objective. | Industrial traffic analysis and security monitoring. Compare protocol coverage, detection use cases, operating maturity and integration with the selected plant. |
| Pilot comparison | Validate the defined deliverable using representative customer inputs and independently reviewed reference results. | Compare the corresponding function and delivery model; the references have different product or service boundaries. |
Based on the supplied AVIR material and linked official reference pages reviewed 26 October 2026. This compares scope, not measured relative performance or Russian-market availability.
Positive Technologies PT ISIM ↗Agree inputs, responsibilities and acceptance before broader deployment.
Choose one bounded use case and document the inputs, target output and responsible reviewers.
Test the selected workflow with representative customer material and an agreed independent reference.
Review evidence, unresolved issues and reproducibility, then complete the agreed documentation and deliverable.
HOOMAS coordinates the technical discussion, demonstration or assessment, project scope and commercial proposal with AVIR.
Email HOOMAS ↗